Roadmap

What's live, and what isn't yet.

So you can judge Jouli on what it does today. Items that aren't built have no dates, because we'd rather not publish one we can't keep.

Updated 16 October 2026

Live today
  • Address lookup and satellite roof scan
  • Bill reading from a photo or PDF
  • Energy model with bill, payback and month-by-month pagesMarked as estimates, with their range
  • Solar STCs from the CER's 137 postcode ranges
  • Cheaper Home Batteries certificatesFactor schedule loaded to 2030
  • Solar Victoria rebate and loan
  • Pricing on your own costs and margins, in every state you set upMargin by size table, % of cost, per kW or per job
  • Your own discount reasons, and custom prices on any jobOwner always; back office if you allow it
  • Pricing tab for costs, margins and extrasEvery save is a new version
  • Margin floor, named discounts, versioned rate card
  • Branded proposal page, options, email and link sending
  • E-signature with a signed copy per version
  • Job sheet, single-line diagram, install outcome
  • Five roles, emailed sign-in codes, dashboard
  • Your own datasheets and reviews on the proposal
  • Sending from your own email domainSet up with us once your domain is verified
Not built yet
  • State rebates beyond Solar VictoriaFederal certificates already work everywhere
  • Victorian Energy Upgrades on a proposalSee below
  • Your own Xero connection
  • Interval meter data (NEM12) upload
  • Full data exportFinance and signed contracts download as CSV today
  • Self-serve sign-up and card billingSet up with us and invoiced today
  • Finance partner integrations
  • On-site photo and evidence capture
  • Single sign-on
Victorian Energy Upgrades

VEU isn't in the cockpit yet.

If you need to quote VEU work this quarter, Jouli isn't the tool for it yet.

What exists. The pricing engine holds the rules for heat pump hot water, VEU activities 1D (replacing an electric water heater) and 3C (replacing a gas or LPG one). It counts VEECs for a product on the VEU register at a Victorian postcode, prices them at your partner's VEEC price, and refuses to price rather than guess when something is missing or the customer's contribution falls under $200.

What doesn't. None of it can be selected in the cockpit, so it reaches no proposal. There are no eligibility questions, no co-payment on the document, and no photo or declaration capture.

Solar and batteries. No VEU activity covers a home's solar or battery. Those quotes use the federal STCs and the Cheaper Home Batteries Program.

Accreditation. Jouli is software. It isn't an accredited provider and doesn't create or trade certificates. VEU work is quoted under the installer's own accreditation.

Program rules are published at energy.vic.gov.au.

Tell us what to build next.

If something on the "not yet" list decides it for you, say so. It shapes the order.